Couldn't find any decent CNC drawings so going to have to make my own, last of insulation gone in and on with templates and mock up, should be able to work out all dimensions and machine up next week, will still need some scribe work but it's coming on.
Coming together, looking good, should be ready next week for the real thing. Its what Sundays were made for.
Plenty storage under rock & roll bed and fitting a overhead at the back and a separate free standing unit as you open the side door for plates, pans etc with preparation area on top. This will be where some people install a buddy seat
Opted for material this time for comfort for the bed. Interior ready next week, fingers crossed I worked it all out right.
Delivery arrived back from CNC and the dry fit has gone well with only a few minor adjustments, and the whole set-up is incredibly light, onto staining & finishing this weekend then it's the install and can move onto the electrics, after much deliberation I have decided to install MPPT for the solar power while at it.....watch this space.