Lenny is on eBay ..... its finally time (for the second time) I've pretty much finished the body off now including the rear tubs and arches since the final post on the blog https://thelatebay.com/index.php?threads/lenny-the-neglected-campervan.90226/ He needs brakes re fitting (pipes and flexi hoses missing) Gear linkage refitting as some unnamed muppet!! forgot to do this when the engine and box went back in. Glass refitting Cargo floor welding back in (I was going to us foam laminated ply like in coach build vans). I'm asking £6,500 which considering I was quoted £6,000 to weld the front half back in 2014, isn't bad :0 https://www.ebay.co.uk/itm/324871710443